After finishing work of concrete batching plant
Many operators neglect the importance of the shutdown of concrete batching plant.which will affect the whole engineering progress because of some small faults. In order to avoid the similar situations occur again, work Should Do after Shutting Down Concrete Mixing Plant
In the freezing season, eliminate the remaining water in the water pump, additive pump, water tank and additive tank. Start the water pump and additive pump and make them run for one to two minutes.
After finishing work of concrete batching plant, clean the mixing drum, discharging door and discharging hopper timely and wash them with water. At the same time, wash the additives and charging systems. Clean up the tool apron and the tool edge of weighing system and ensure the weighing accuracy.
When moving or stopping using the concrete mixing plant, the materials in the water tank, additive tank, storage hopper of cement and stones and weighing hopper should be eliminated and wash them cleanly. When moving concrete batching plant, fix the counter weight of the lever and uninstall the transducer.Haomei is a leader in China’s construction machinery industry.Welcome customers to buy twin shaft concrete batching plant from Haomei Machinery.